N° 008
Retaining wall and drain, Kalamassery
Civil work · Kalamassery, Ernakulam · 2023

120 metres of laterite retaining wall with weep holes, and a covered stormwater drain along a sloping road that used to flood every monsoon.
- Kind
- Civil work
- Status
- Handed over
- Where
- Kalamassery, Ernakulam
- Built for
- A residents' association
- Work started
- 9 Jan 2023
- Handed over
- 12 May 2023
- Took
- 4 months
- Length
- 120 m
- Height
- 1.2 to 3 m
- Drain
- RCC, 600 mm wide, with removable cover slabs