N° 014

House at Kakkanad

New house · Kakkanad, Kochi · 2026

The finished house at Kakkanad seen from the front: white upper floor, laterite-clad ground floor and a sloping clay-tile roof

A two-storey house on a 9-cent plot near Infopark: laterite-clad ground floor, lime-plastered upper floor and a long clay-tile roof that also shades the car porch.

Kind
New house
Status
Handed over
Where
Kakkanad, Kochi
Built for
A family of four; the father works in Doha and followed the build on WhatsApp
Plot
9 cents · 3,920 sq ft
Built-up area
2,850 sq ft (265 m²)
Floors
G+1
Work started
10 Feb 2025
Handed over
14 Mar 2026
Took
12 months
Rate
₹2,350 per sq ft built-up
Structure
RCC frame, M25 concrete to IS 456
Foundation
Laterite masonry on RCC footings
Walls
Solid concrete blocks; laterite cladding on the ground floor
Roof
Steel frame with Mangalore clay tiles over an RCC slab
Flooring
Vitrified tiles; granite in the living room

What we did

  • Soil test and structural design with the client's architect
  • Building permit drawings for K-SMART
  • Complete civil, electrical and plumbing work
  • Rainwater pit and a 6,000-litre sump
  • Weekly photo updates on WhatsApp for the family abroad

Site diary

Dated photos from the site, stage by stage. On this sample site the photos are generated stand-ins.

  1. Excavated pits in red soil with steel cages for the column footings, one footing freshly concreted
    27 Feb 2025Footings castTwelve column footings, each checked for level before the pour.
  2. A finished concrete plinth beam on a laterite foundation outlining the rooms, with column bars standing up
    2 Apr 2025Plinth beam completeAnti-termite treatment done before the floor was filled.
  3. Plywood shuttering on steel props with a mesh of reinforcement bars on top, block walls below
    18 Jun 2025Ground-floor slab, steel checkedCast in one pour the next morning; cube tests passed at 28 days.
  4. The concrete frame complete, with laterite block walls rising on the upper floor behind bamboo and steel scaffolding
    22 Aug 2025Upper-floor walls
  5. A sloping steel roof frame half covered with clay tiles over white-plastered walls
    30 Oct 2025Roof frame and tiles
  6. The finished house from the front on handover day
    14 Mar 2026HandoverSnag list of 23 items closed before the keys were handed over.